Description
In certain storage configurations, at the request of the DREAL, storage platforms must be able to withstand fire for 30 minutes.
The metal profiles of the mezzanine are sized accordingly in such cases, and fire resistance calculations are carried out according to the desired configuration.
Fire-resistant platforms and mezzanines are custom-made, perfectly suited to your installation. We handle the complete service: study, calculation note, and installation throughout the territory.
The metal profiles of the mezzanine are sized accordingly in such cases, and fire resistance calculations are carried out according to the desired configuration.
Fire-resistant platforms and mezzanines are custom-made, perfectly suited to your installation. We handle the complete service: study, calculation note, and installation throughout the territory.
Technical specifications
| Category | Packing, Handling, Logistics |
|---|---|
| Subcategory | Storage equipment |



































